Sign In | Join Free | My himfr.com
Home > Formwork Tie Rod System >

Tie Rod Construction Formwork Super Plate For Wall Formwork System

    Buy cheap Tie Rod Construction Formwork Super Plate For Wall Formwork System from wholesalers
     
    Buy cheap Tie Rod Construction Formwork Super Plate For Wall Formwork System from wholesalers
    • Buy cheap Tie Rod Construction Formwork Super Plate For Wall Formwork System from wholesalers
    • Buy cheap Tie Rod Construction Formwork Super Plate For Wall Formwork System from wholesalers

    Tie Rod Construction Formwork Super Plate For Wall Formwork System

    Ask Lasest Price
    Brand Name : HORIZON
    Model Number : Slope super plate
    Certification : SGS
    Price : pls ask HORIZON
    Payment Terms : L/C, T/T
    Supply Ability : 10000 pcs per week
    Delivery Time : 15-25 days
    • Product Details
    • Company Profile

    Tie Rod Construction Formwork Super Plate For Wall Formwork System


    Tie Rod Construction Formwork Super Plate For Wall Formwork System

    The Super Plate is a combination of a wing nut and a plate, used for inclined formwork. The wing nut is undetachable from the plate. Both the plate and the nut are cast.
    The articulation of the wing nut is approx. 15° for square plates and 5° for round plates.

    Item No.Bar dia (mm)Plate dia(mm)Weight(kg)
    SP-120H15120 x 1201.28
    SP-120L15120 x 1201.1
    SP-Ø12015Ø1201.0
    SP-Ø13020Ø1301.0

    Part NameSpecificationWeight (kg)Remark

    Tie-rod

    D15
    D20

    1.5 kg/m
    2.7 kg/m

    L=6m;
    Special length available upon request.

    Slope Super plate

    D151.28Used in case of tie-rod and formwork panels are not vertical.

    3-lug wing nut

    D15
    D20

    0.97
    0.78

    For tie-rod D15;
    For tie-rod D20

    Waling plate

    120 x 120 x 6, Φ19
    120 x 120 x 8, Φ19

    0.65
    0.85

    For tie-rod and nut D15;
    galvanized

    Water stopper

    D15
    D20

    0.55
    0.72

    Used in water resistant wall;
    With tie-rod D15 / D20

    Anchor plate

    D200.95Embedded in concrete as lost part


    Tie Rod Construction Formwork Super Plate For Wall Formwork System
    Packing:
    1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
    2. Different packages are used for different products:
    ---bundles: timber beam, steel props, tie rod, etc.
    ---pallet: small parts will be put in bags and then on pallets.
    ---wooden cases: it is available on customer's request.
    ---bulk: some irregular goods will be loaded in bulk in container.

    Product Tags:

    shuttering tie rod

      

    tie rod scaffolding

      
    Quality Tie Rod Construction Formwork Super Plate For Wall Formwork System for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: HORIZON FORMWORK CO., LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)