Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | HORIZON |
Model Number : | HORIZON CLIMBING SYSTEM |
Price : | pls ask HORIZON |
Payment Terms : | L/C, T/T |
Supply Ability : | 100 tons per week |
Delivery Time : | 20-25 days |
Climbing Formwork System by Crane In Wall Formwork Construction For High Towers
Climbing Formwork CB240 is a crane dependent climbing system and
support structure widely used to pour high walls. It performs as a
loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is
applicable to heights of more than 100 m over ground and allows a
maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing
concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in
the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet
site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by
using a safety ladder.
![]() | 1. Climbing bracket 2. Main platform 3. Pouring platform 4. Finishing platform 5. Roll-back system 6. Push-pull prop 7. Vertical waling 8. Anchor system 9. Formwork |
![]() |