Sign In | Join Free | My himfr.com
Home > Scaffolding Steel Prop >

EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System

    Buy cheap EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System from wholesalers
     
    Buy cheap EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System from wholesalers
    • Buy cheap EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System from wholesalers
    • Buy cheap EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System from wholesalers

    EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System

    Ask Lasest Price
    Brand Name : HORIZON
    Model Number : Steel prop 20-350
    Certification : SGS
    Price : pls ask HORIZON
    Payment Terms : L/C, T/T
    Supply Ability : 20000 pcs per week
    Delivery Time : 15-25 days
    • Product Details
    • Company Profile

    EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System

    EN1065 Steel Prop 20-350 For Table Formwork System, Galvanized Finishing​​


    Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props, which result in safe and efficient use on sites.


    The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

    SpecificationCapacity (KN)Height (mm)Dia (mm)Weight (Kg)
    HZP30-300301650-300076/6320.9
    HZP30-350301970-350076/6323.0
    HZP30-400302210-400076/6325.0
    HZP20-300201650-300060/4815.7
    HZP20-350201970-350060/4816.0
    HZP20-450202460-450060/4828.2
    HZP20-500202710-500060/4830.5

    Important Instructions:

    • The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

    • Check formwork and prop erection before concrete pouring.

    • Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

    • Avoid the sudden emptying of the concrete bucket onto the formwork.

    • Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

    • Before starting any dismantling operation, check the state of the props.
    EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System

    Quality EN1065 Galvanized Finish Scaffolding Steel Prop 20-350 For Table Formwork System for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: HORIZON FORMWORK CO., LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)