Sign In | Join Free | My himfr.com
Home > Climbing Formwork System >

Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform

    Buy cheap Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform from wholesalers
     
    Buy cheap Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform from wholesalers
    • Buy cheap Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform from wholesalers
    • Buy cheap Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform from wholesalers
    • Buy cheap Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform from wholesalers

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform

    Ask Lasest Price
    Brand Name : HORIZON
    Model Number : Climbing bracket
    Price : pls ask HORIZON
    Payment Terms : L/C, T/T
    Supply Ability : 100 tons per week
    Delivery Time : 20-25 days
    • Product Details
    • Company Profile

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform

    Climbing Sequence of Climbing Bracket System for High-rise Wall Construction

    Climbing Formwork CB240 is a crane dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.
    Advantages:
    Platform width: 2.4m
    Roll-back system: 70 cm with carriage and rack system
    Finishing platform: for removing the climbing cone, polishing concrete surface etc.
    Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
    Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
    Main platform: provide workers a safe working platform
    Finishing platform: there is an access to the main platform by using a safety ladder.


    Climbing sequence:

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform
    Step 1
    The first pouring is to be completed by using the proper wall elements and has to be exactly
    aligned with adjusting struts.

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform
    Step 2
    The completely pre-assembled climbing scaffold units consisting of
    climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.
    Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform
    Step 3
    After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform
    Step 4
    Release and remove bolts that fixing the positioning anchor point.
    Loosen and remove tie-rod
    Loosen the wedges of the carriage unit.

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform
    Step 5
    Retract the carriage and lock it with wedge.
    Install upper climbing cones
    Loosen wind securing device, if any
    Remove the lower climbing cone

    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform
    Step 6
    Adjust the carriage into the common center of gravity and lock it again.
    Attach the crane sling to the vertical waling
    Remove the security bolts of the bracket
    Lift the climbing bracket by crane and attach it to the next prepared climbing cone.
    Insert and lock the security bolts again.
    Install the wind-load device, if required.


    Step 7
    Move the carriage back and lock it by wedge.
    Clean the formwork.
    Install reinforcement bars.


    Step 8
    Move the formwork forward until lower end rests against top of the finished section of the wall
    Adjust formwork vertically by means of push-pull brace.
    Fix tie-rods for the wall formwork


    Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform

    Quality Light Weight Climbing Formwork System , Self Climbing Scaffold 2.4m Platform for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: HORIZON FORMWORK CO., LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)