Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | HORIZON |
Model Number : | HORIZON CLIMBING SYSTEM |
Price : | pls ask HORIZON |
Payment Terms : | L/C, T/T |
Supply Ability : | 100 tons per week |
Delivery Time : | 20-25 days |
High Efficient Climbing System for Construction of Core Wall and Bridge Piers
Climbing system CB240 is crane dependent, serving as a support
structure widely used to pour high walls. It performs as a
loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is
applicable to heights of more than 100 m over ground and allows a
maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing
concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in
the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet
site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by
using a safety ladder.
1. Climbing bracket 2. Main platform 3. Pouring platform 4. Finishing platform 5. Roll-back system 6. Push-pull prop 7. Vertical waling 8. Anchor system 9. Formwork |
Components | Diagram / photo | Specification / description |
Climbing bracket | ![]() | For all vertical formworks |
H20 Timber beam | ![]() | Water proof treated Height: 200mm Width: 80mm Length: as per table size |
Steel waling | ![]() | Painted, powder coated [12 steel channel |
Flange clamp | ![]() | Galvanized To connect steel waling and H20 beams |
Panel strut | ![]() | Painted |
Waling connector 80 | ![]() | Painted Used for formwork panels alignment |
Corner connector 60x60 | ![]() | Painted Used for forming inner corner formwork with wedge pins |
Top scaffold bracket | ![]() | Painted, severs as safety working platform |
Packing:
1. Generally, the total net weight of loaded container is 22 tons
to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days
after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for
years, supplying: Formwork systems, scaffolding systems and related
accessories, which are widely used in commercial, residential and
infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork,
flexible slab formwork, frame scaffolding system, ringlock
scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line,
and pre-packing, which ensures the reliable product quality as per
customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a
comprehensive and complete concrete formwork and scaffolding
solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
![]() |